Sökresultat:
13 Uppsatser om Hydroelectric dam - Sida 1 av 1
Vattenflödets betydelse för fångster av lekvandrande lax (Salmo salar) och öring (Salmo trutta) : En utvärdering av laxfällan vid vattenkraftverket i Forshaga
Many watersheds have lost stocks of migrating fish species because of the development of hydroelectric plants and other fragmenting barriers. The remaining stocks of migrating Atlantic salmon (Salmo salar) and brown trout (Salmo trutta) in River Klarälven, Sweden are five times smaller compared to one hundred years ago. A fish-trap at the hydroelectric plant in Forshaga has been vital for the continued existence of the stocks. This is the first hydroelectric plant of eight, blocking the way to the spawning grounds. Spawners are collected in the trap for both hatchery and transport by truck upstream and past seven more hydroelectric plants to the spawning grounds, where they are released for possible natural reproduction.
Hot och risker med dricksvattenförsörjning : Förutsättningari tid och rum för bevarande av Sundsvalls och Timrås dricksvattenförsörjning
This study describes what impact activity within Wifstas, Matfors,Grönstas and Nolbys water protection areas have on the quality of the drinkingwater. It considers the use of the area, environmentally dangerous activitiesin the past and present, the geology?s part, what harm hydroelectric power damsmay cause if they break and how climate change might affect the area in thefuture. It also takes into consideration activities outside the waterprotection areas which might have a suspected impact on the water quality. Theresults of the study are that pollution from infrastructure such as roads, orwastewater from treatment plants may cause occasional contamination of thedrinking water, foremost due to flooding.
Tidssynkroniserade mätningar i vattenkraftstationer
Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.
Identifiering av synkronmaskinsmodell genom SSFR-test
At the Division of Electricity at Uppsala University there is an experimental rig forhydroelectric generators. The experimental rig?s vital part is a 12-pole synchronousmachine, whose electrical characterizing parameters (resistances, inductances andtime constants) are unknown. The aim of this thesis is to characterize the machine inits current state by perform a Standstill Frequency Response (SSFR) test. From theanalysis of the measurement data, which is a part of the test, a set of basic parametershave been received.
Alternativ till fortsatt elektrisk generering i Olidan
In this thesis a possible cost effective runner change of some of the units in the hydroelectric power station Olidan is investigated. The possibility to drive a unit at the same efficiency point through a change of the turbine shaft speed and the rate of discharge is tested. Furthermore the theories behind model testing, determination of efficiency increase from model to prototype and efficiency measurements shall be discussed and analyzed with Olidan as a starting point.A predicted curve has been built on information from model tests and field measurements on the existing runners and runner data from the test of the new model. The predicted curve shows the difference in efficiency between an existing runner and a modern one. It is the difference in efficiency that is used in the calculations that are to show whether changing to a pair of new runners will be cost effective or not.
Den urbaniserade Umeälven : Vattenkraftverken som utsträckt urbanisering
This paper examines the power producing dams along the Ume-river as an integral part of and a result from the urbanization process in Sweden during industrial capitalism. The aim of the paper is to contribute to the knowledge of the urbanization process in Sweden in general and of its traces along the Ume river in the county of Västerbotten in particular. The paper applies the theory of concentrated urbanization and extended urbanization put forward by Neil Brenner and Christian Schmid (2015) and argues that the building of power producing dams along the Ume-river is part of an extended urbanization process. This becomes particularly evident when examining the vast physical structures that is the dams, situated in an otherwise remote and sparsely populated area. These vast physical structures are also very well connected to a nation wide electric grid that has connections to bordering countries as well.
Beteende hos lekvandrande lax i Klarälven ? utvärdering av en fiskfälla
During the migration season in 2013 a study on spawning migrating salmon and the effect of water flow on the behavior was conducted of the salmon at the Forshaga hydropower station in the River Klarälven. The River Klarälven with its nine hydropower plants on the Swedish side, constituting migration obstacles for the migrating salmon. Fortum Generation AB has together with the County Administrative Board restored a salmon trap at the lowermost hydropower station in Forshaga, aiming at making it possible for the salmon to swim into the trap, and thereafter be transported by truck past the power plants and then continue their journey to the spawning grounds on their own. Unfortunately, it is believed that the trap does not work as well as it should. In this study, I focused on salmon position in relation to water flow and if the number of salmon that swam into the fish trap differed between salmon with previous experience of the trap (experienced) and salmon without experience (unexperienced).
Småskalig vattenkraft : Dagsläge och framtidsplaner
This study focuses on small scale hydropower in Sweden. This means plants with a capacity of up to 10 MW. The study has a special focus on plants with a capacity up to 2 MW. The study has three aims. It strives to describe the small-scale hydroelectric industry in Sweden.
Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage
In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.
Analys och dimensionering av robusta kilspårsförband
This master thesis comprises analysis and dimensioning of a keyed joint between a generator axis and a hub with aid from the FEM-software ANSYS Workbench 13.0.The generator axis is a part of a hydroelectric power station that generates electricity with a reactions turbine, a Kaplan turbine. The existing keyway consists of one parallel key with the width 90 mm and height 45 mm. Due to a planned increase of the power of the generated power with 32 % a design study was needed to see if the keyed joint would be suitable for the extra force. Because of the fact that the axis diameter is bigger than the standards covers/recommends a the keyway had to be re-dimensioned. In an earlier assignment from Skellefteå Kraft AB to Sweco Energuide the keyway was planned to be properly dimensioned, but no final solution was approved.During this master thesis a number of different numerical tests were made.
Undersökning av energiförbrukning och konceptutveckling av mer energisnåla frukostmaskiner
This master thesis comprises analysis and dimensioning of a keyed joint between a generator axis and a hub with aid from the FEM-software ANSYS Workbench 13.0.The generator axis is a part of a hydroelectric power station that generates electricity with a reactions turbine, a Kaplan turbine. The existing keyway consists of one parallel key with the width 90 mm and height 45 mm. Due to a planned increase of the power of the generated power with 32 % a design study was needed to see if the keyed joint would be suitable for the extra force. Because of the fact that the axis diameter is bigger than the standards covers/recommends a the keyway had to be re-dimensioned. In an earlier assignment from Skellefteå Kraft AB to Sweco Energuide the keyway was planned to be properly dimensioned, but no final solution was approved.During this master thesis a number of different numerical tests were made.
Reglering av turbins ledskenor i vattenkraftverkmed hjälp av elektriska ställdon
Hydropower is the largest renewable energy source available in today's society. Operation and production is handled by high-tech electronics. This thesis is done on behalf of Statkraft Sweden AB who wants to explore the possibility of replacing the hydraulic cylinder with an electric actuator, generally as well as a case of a small power station on the river Nissan. Whether it is the chaplain or francis turbine vanes are actuated by hydraulic cylinders. Because of Gustavsberg hydropower is inconstant operation, this report is based on power calculations, which are read and computed according to the available hydraulic diagram.
Välkommen : vackrare infart till Vilhelmina
The purpose of this thesis is to show how a good approach can be designed, focusing on the southern approach to the Swedish town Vilhelmina. Prior to the car being part of everyday life, the approach was a road where the town showed itself from the very best side. When the amount of traffic increased, so did noise and other disturbances, and as a consequence industrial areas replaced the residential buildnings at the approaches. Today, the pendulum is turning back and in recent years the approach is regarded as a place to introduce the town. The approach is also the place where cars should slow down from the speed of the main road to the speed of the city.